Method for forming molded article by press molding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10960633
APP PUB NO 20180036984A1
SERIAL NO

15552654

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method of forming a compact based on the press forming method provides a compact having high density and not having cracking or surface roughness in a product and without compact adhesion to press forming mold wall occurring, including steps: filling raw material powder in a cavity formed by an outer mold and lower punch, or outer mold and lower punch and core rod, pressing and forming raw material powder between an outer punch and lower punch, and extracting the compact obtained out of the outer mold by the lower punch, wherein a lubricating film of a press forming mold lubricant containing oil as main component is formed on at least part of outer mold inner surface, or outer mold inner surface and core rod outer circumferential surface before filling the raw material powder in the cavity, and press forming so that compact density ratio is not less than 93%.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESONAC CORPORATION9-1 HIGASHI-SHIMBASHI 1-CHOME MINATO-KU TOKYO 1057325 ?1057325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ichikawa, Junichi Matsudo, JP 76 575
Kohida, Tomoyuki Yachimata, JP 4 17
Onodera, Satoshi Matsudo, JP 71 257
Ueda, Katsuhiko Matsudo, JP 31 333

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00