Total knee prosthesis with ceramic-on-ceramic friction torque and mobile ceramic plate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10667920
APP PUB NO 20180036130A1
SERIAL NO

15549305

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A total knee prosthesis to be implanted in a human patient includes a femoral element having a longitudinal axis, a tibial plateau having a longitudinal axis and a mobile plate. The mobile plate is interposed between the femoral element and the tibial plateau to form two joints with them wherein: a) the surfaces of mutual friction of the femoral element with the mobile plate and the surfaces of mutual friction of the tibial plateau with the mobile plate are entirely constituted by one and the same massive ceramic material; and b) the mobile plate includes two condylar bowls, and the femoral element includes two condyles, the condyles and the condylar bowls each having surfaces of mutual friction spaced apart from each other by a distance smaller than 100 μm when the longitudinal axes of the femoral element and the tibial plateau form an angle of 0° to 75°.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASSISTANCE PUBLIQUE - HOPITAUX DE PARIS3 AVENUE VICTORIA 75004 PARIS FRANCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sedel, Laurent Jouy en Josas, FR 3 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00