Optical cross-connect node and optical signal switching method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10291971
APP PUB NO 20180035182A1
SERIAL NO

15728751

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical cross-connect node includes a first optical switching switch, a second optical switching switch, a wave-dropping wavelength switching switch, a wave-adding wavelength switching switch, and a pass-through dimension switching switch. The first optical switching switch receives an optical signal, where the optical signal includes a first optical signal and/or a second optical signal. The first optical switching switch sends the first optical signal to the wave-dropping wavelength switching switch. The first optical switching switch sends the second optical signal to the pass-through dimension switching switch. The wave-dropping wavelength switching switch performs wavelength switching on the first optical signal. The wave-adding wavelength switching switch performs wavelength switching on a third optical signal generated locally and sends it to the second optical switching switch. The pass-through dimension switching switch performs dimension switching on the second optical signal and sends, to the second optical switching switch, the second optical signal that has undergone dimension switching.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI TECHNOLOGIES CO LTD518129 \U3001 BANTIAN HUAWEI HEADQUARTERS OFFICE BUILDING LONGGANG DISTRICT GUANGDONG SHENZHEN SHENZHEN CITY GUANGDONG PROVINCE 518129

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Qian, Yi Shenzhen, CN 40 648
Wang, Dawei Munich, DE 174 616

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00