Video information reproduction system and video information reproduction device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9912845
SERIAL NO

15550685

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A video information reproduction system includes first and second video information reproduction devices. A first synchronization signal processor of the video information reproduction device as a master device generates a phase synchronization signal including a first vertical synchronization signal and a first counter value and sends it to the second video information reproduction device. A second synchronization signal processor of the second video information reproduction device as a slave device compares the phase synchronization signal with a second vertical synchronization signal on the basis of a second video clock signal, and a second clock generator changes the frequency of a second decode reference clock signal on the basis of a result of the comparison.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maruyama, Kiyoyasu Tokyo, JP 23 155
Uemura, Keiji Tokyo, JP 16 47
Yamada, Kazuhiko Tokyo, JP 64 750

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00