Method and device for transmitting data

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10333666
APP PUB NO 20180034605A1
SERIAL NO

15126145

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method for transmitting data. The method comprises: dividing an available system bandwidth into a plurality of pre-defined candidate positions, and determining a frequency domain position of data transmission based on the pre-defined candidate positions; and transmitting data in the determined frequency domain position. Also disclosed is a device for transmitting data, comprising: a dividing module configured to divide an available system bandwidth into a plurality of pre-defined candidate positions; a determination module configured to determine a frequency domain position of data transmission based on the pre-defined candidate positions; and a transmission module configured to transmit data in the determined frequency domain position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZTE CORPORATION518057 DEPARTMENT OF LAW ZHONGXING BUILDING SOUTH HI TECH INDUSTRIAL PARK NANSHAN DISTRICT HI TECH INDUSTRIAL PARK GUANGDONG SHENZHEN SHENZHEN CITY GUANGDONG PROVINCE 518057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Xianming Shenzhen, CN 132 251
Dai, Bo Shenzhen, CN 564 3879
Fang, Huiying Shenzhen, CN 160 1050
Shi, Jing Shenzhen, CN 280 1841
Xia, Shuqiang Shenzhen, CN 253 2064

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00