Motor driving device, an air conditioner including same and a control method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10171022
APP PUB NO 20180034403A1
SERIAL NO

15531117

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor driving device is disclosed. The motor driving device includes: a rectifier rectifying alternating current (AC) power into direct current (DC) power to output an input voltage; a first buck-boost converter including a plurality of switches for converting the input voltage and having a buck mode of stepping down the input voltage and a boost mode of stepping up the input voltage; an inverter converting a DC-link voltage transformed from the first buck-boost converter into an AC voltage and transferring the AC voltage to a motor; and a controller receiving motor information related to driving of the motor, comparing magnitudes of a desired DC-link voltage depending on the received motor information and the input voltage with each other, and performing a control to switch only any one of the plurality of switches so that the first buck-boost converter is operated in the buck mode or the boost mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO
RESEARCH BUSINESS FOUNDATION SUNGKYUNKWAN UNIVERSITYSUNGKYUNKWAN UNIVERSITY 2066 SEOBU-RO JANGAN-GU SUWON-SI GYEONGGI-DO 16419

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jin-han Suwon-si, KR 82 743
Kim, Min-kook Suwon-si, KR 7 63
Kim, Sun-jin Suwon-si, KR 31 533
Lee, Byoung-kuk Yongin-si, KR 7 59
Park, Hyun-soo Seoul, KR 107 820
Woo, Dong-gyun Suwon-si, KR 4 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 1, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00