Power supply device and air conditioner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10063133
APP PUB NO 20180034361A1
SERIAL NO

15550506

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply device includes a first rectifying unit that converts the AC power passed through an input unit into DC power, a power-factor improving unit that improves a power factor of the DC power output from the first rectifying unit, a first power storage unit that stores the DC power passed through the power-factor improving unit and supplies the stored DC power to a load side, a second rectifying unit connected to a portion where the input unit is connected to the AC power supply, the second rectifying unit converting the AC power into the DC power, a second power storage unit that stores the DC power passed through the second rectifying unit, and a control unit that operates using the electric power stored in the second power storage unit and, when a short-circuit failure occurs in the power-factor improving unit, performs control for interrupting the input unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shizu, Keiichiro Tokyo, JP 16 24
Yamakawa, Hidetoshi Tokyo, JP 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00