Connector having a short circuit terminal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10062998
APP PUB NO 20180034184A1
SERIAL NO

15639096

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector includes: a short circuit terminal housed in a first housing and having contact pieces contacting with adjacent first terminals of a plurality of first terminals respectively with the first housing and a second housing not being engaged with each other; and a releaser provided in the second housing and configured to displace the contact pieces and release contact between the adjacent first terminals and the contact pieces upon engaging of the first housing and the second housing. The contact pieces include: contact portions contactable with the adjacent first terminals respectively; and slide portions slidable on the releaser and respectively arranged in positions anterior to the contact portions in an engaging direction of the first housing and the second housing. The contact portions are apart from the releaser with the contact pieces being displaced due to slide of the slide portions on the releaser.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
YAZAKI CORPORATION8-15 KONAN 1-CHOME MINATO-KU TOKYO 108-0075

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kobayashi, Hiroshi Okazaki, JP 902 9719
Misaiji, Takeshi Seto, JP 10 249
Sekino, Tetsuya Makinohara, JP 32 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00