Connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10084247
APP PUB NO 20180034168A1
SERIAL NO

15548182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is aimed to reduce work man-hours when a twisted pair cable is brought into pressure contact. A connector (C) includes two insulation displacement terminal fittings (30) with which wires (41A, 41B) constituting a twisted pair cable (40A, 40B) are individually brought into pressure contact, a holder (10) configured to hold the two insulation displacement terminal fittings (30) such that pressure contact portions (34) formed in the insulation displacement terminal fittings (30) are arranged in a direction intersecting with a routing direction of the twisted pair cable (40A, 40B), and a dividing rib (37, 38) formed in the holder (10) and configured to separate two wires (41A, 41B) to correspond to two pressure contact portions (34) in the process of bringing the twisted pair cable (40A, 40B) closer to pressure contact positions with the pressure contact portions (34).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO WIRING SYSTEMS LTD1-14 NISHISUEHIRO-CHO YOKKAICHI-SHI MIE 5108503 ?5108503
SUMITOMO ELECTRIC INDUSTRIES LTD5-33 KITAHAMA 4-CHOME CHUO-KU OSAKA-SHI OSAKA 5410041 ?5410041
AUTONETWORKS TECHNOLOGIES LTD1-14 NISHISUEHIRO-CHO YOKKAICHI-SHI MIE 5108503 ?5108503

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsui, Hajime Mie, JP 76 187
Omori, Yasuo Mie, JP 110 452

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00