Stack voltage control for recovery mode using boost converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10069160
APP PUB NO 20180034077A1
SERIAL NO

15221024

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell voltage recovery system includes a fuel cell stack having a fuel cell stack voltage between fuel cell stack terminals which is at a first voltage during normal fuel cell operation. The system also includes a high voltage electrical system operating at a first DC operating voltage that is generally higher than the first voltage of the fuel cell stack. A boost converter in electrical connection with the fuel cell stack and the high voltage electrical system operates in a normal control mode to transfer electrical power from the fuel cell stack to the high voltage electrical system through regulation and control of average stack output current (boost input current) during normal fuel cell operation. The boost converter can also operate in a voltage control mode to lower the fuel cell stack voltage to a second voltage that is lower than the first voltage. A FCS controller controls the operation of the boost converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berg, Joseph West Bloomfield, US 9 14
Cai, Jun Fairport, US 184 1618
Garcia, Sergio E Commerce Township, US 16 28
Kirklin, Matthew C Coleman, US 25 103
Smith, Daniel W Shelby Township, US 28 169

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00