Nonaqueous electrolyte secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10374205
APP PUB NO 20180034032A1
SERIAL NO

15556929

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is an object of the present invention to improve the low-temperature output characteristics of a nonaqueous electrolyte secondary battery. A nonaqueous electrolyte secondary battery according to an embodiment includes an electrode assembly having a structure in which a positive electrode and a negative electrode are stacked with a porous separator provided therebetween. The positive electrode contains tungsten and a phosphate compound. The separator contains a material having higher oxidation resistance than a polyethylene and has a pore distribution peak sharpness index of 40 or more in the range of 0.01 μm to 10 μm as calculated using formula 1: formula 1: pore distribution peak sharpness index=(peak value of Log differential pore volume)/(difference between maximum pore size and minimum pore size at position corresponding to ½ peak value of Log differential pore volume).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC ENERGY CO LTD1-1 MATSUSHITA-CHO MORIGUCHI-SHI OSAKA 570-8511

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Atsushi Hyogo, JP 273 2424
Niina, Fumiharu Hyogo, JP 48 128
Nishide, Daisuke Hyogo, JP 36 143

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00