Silicon carbide single crystal substrate, silicon carbide semiconductor device, and method for manufacturing silicon carbide semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9978651
SERIAL NO

15552863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A silicon carbide single crystal substrate includes a first main surface and a second main surface opposite to the first main surface. The first main surface includes a central square region and an outer square region. When viewed in a thickness direction, each of the central square region and the outer square region has a side having a length of 15 mm. The first main surface has a maximum diameter of not less than 100 mm. The silicon carbide single crystal substrate has a TTV of not more than 5 μm. A value obtained by dividing a LTIR in the central square region by a LTV in the central square region is not less than 0.8 and not more than 1.2. A value obtained by dividing a LTV in the outer square region by the LTV in the central square region is not less than 1 and not more than 3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO ELECTRIC INDUSTRIES LTDOSAKA JAPAN OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honke, Tsubasa Itami, JP 29 26
Okita, Kyoko Itami, JP 63 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00