Methods for fabricating semiconductor devices using a multilayer lithography process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10290509
APP PUB NO 20180033637A1
SERIAL NO

15443370

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Example embodiments relate to a method for fabricating a semiconductor device. The method for fabricating a semiconductor device includes stacking on a substrate an etching target layer, a first mask layer, and a photoresist layer, irradiating extreme ultraviolet (EUV) radiation on the photoresist layer to form a photoresist pattern, patterning the first mask layer to form a first mask pattern using the photoresist pattern as an etching mask, and patterning the etching target layer to form a target pattern using the first mask pattern as an etching mask. The first mask layer includes at least one of a silicon layer and a titanium oxide layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU GYEONGGI-DO SUWON-SI 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Seok-Won Suwon-si, KR 7 32
Choi, Taeseop Hwaseong-si, KR 7 42
Do, Sinhae Busan, KR 2 8
Ha, Kon Suwon-si, KR 5 14
Kim, Nam-Gun Yongin-si, KR 37 859
Lee, Sangmin Hwaseong-si, KR 174 1233

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00