Reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10192670
APP PUB NO 20180033536A1
SERIAL NO

15553024

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a reactor that can maintain the state of being fixed to an installation target, and whose magnetic core is difficult to damage. The reactor includes a combined body that includes: a coil; and a magnetic core that is located inside and outside the coil to form a closed magnetic circuit. An outer core portion of the magnetic core, the outer core portion, which is located outside the coil: is formed using a composite material that is a resin in which magnetic powder is dispersed; and is provided with bolt holes into which bolts for fixing the combined body to an installation target are inserted. The reactor further includes a flat plate member that is fastened to the outer core portion by the bolts, and is disposed such that the coil is exposed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO WIRING SYSTEMS LTD1-14 NISHISUEHIRO-CHO YOKKAICHI-SHI MIE 510-8503
SUMITOMO ELECTRIC INDUSTRIES LTDOSAKA JAPAN OSAKA
AUTONETWORKS TECHNOLOGIES LTDMIE JAPAN MIE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inaba, Kazuhiro Mie, JP 80 269
Nishi, Kouji Mie, JP 19 208
Yamamoto, Shinichiro Mie, JP 54 449

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00