Stringed instrument with lead crystal fingerboard or fretboard and bridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10008185
SERIAL NO

15655745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The fingerboard/fretboard and/or bridge of a stringed instrument such as a guitar or violin is constructed lead crystal in lieu of the tradition wood construction utilized for these components. The lead crystal components are identically shaped to the components they are replacing. Changing the materials of construction of the fingerboard/fretboard and/or bridge to lead crystal in the stringed instrument creates a sound which is cleaner and with less distortion than those stringed instrument with a wooden fingerboard/fretboard and/or bridge. Additionally, utilizing a lead crystal the fingerboard/fretboard and/or bridge also provides a unanticipated benefit, the instrument is no longer capable of creating a screeching sound when played improperly. The resulting instrument is one which is simpler to play for both novices and advanced players, which is still capable of emanating an appealing sound.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RULIFSON ALANNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rulifson, Alan St. Petersburg, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00