Semiconductor device and electronic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10255838
APP PUB NO 20180033359A1
SERIAL NO

15654802

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a semiconductor device in which power consumption and rewrite time needed for changing the parameter for color adjustment, dimming, or the like are reduced. One embodiment of a semiconductor device of the present invention includes an image processing portion including a plurality of functional circuits configured to correct image data, a plurality of scan chains corresponding to the plurality of functional circuits, and a controller controlling operations of the plurality of scan chains. During a state in which the controller controls the scan chains so that one or more scan chains chosen from the plurality of scan chains are driven and the scan chains except for the one or more scan chains are not driven, a parameter stored in one or more functional circuits connected to the one or more scan chains is rewritten.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDKANAGAWA KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurokawa, Yoshiyuki Kanagawa, JP 540 7744
Okamoto, Yuki Kanagawa, JP 178 850
Yoneda, Seiichi Kanagawa, JP 94 911

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00