Test board for semiconductor package, test system, and method of manufacturing semiconductor package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10088521
APP PUB NO 20180031629A1
SERIAL NO

15455550

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A test board includes: a board substrate; a device under test (DUT) socket connected to the board substrate and configured to accommodate a semiconductor package; a test controller; a wireless signal unit configured to wirelessly exchange signals with a server; and a wireless power unit configured to be wirelessly charged by an external source and configured to supply electric power to the test controller and the DUT socket, wherein the test controller is configured to independently perform a test on the semiconductor package accommodated in the DUT socket in response to a test pattern command being wirelessly received from the server via the wireless signal unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRIC CORPORATION129 SAMSUNG-RO YEONGTONG-GU GYEONGGI-DO SUWON-SI 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Woon-sup Asan-si, KR 5 18
Lee, Moon-ho Asan-si, KR 5 21
Shin, Seong-seob Asan-si, KR 2 13
Yun, Joo-sung Asan-si, KR 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00