System and method for high speed surface and subsurface FOD and defect detection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10041889
APP PUB NO 20180031491A1
SERIAL NO

15225493

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for the detection of foreign object debris materials or defects on and/or under a surface (e.g., outer ply) of a composite part being formed by a composite layup machine. A gantry moves over the composite part along a predetermined length thereof. A thermal excitation source fixed to the gantry directs infrared radiation across the width of the surface of the composite part. A infrared camera fixed to the gantry a predetermined distance away from the thermal excitation source scans the surface as the gantry moves to detect and output scan information thereof. A controller is coupled to the thermal excitation source and to the infrared camera. The controller processes the sequence of infrared images to identify a foreign object debris material or defect located on and/or under the surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Safai, Morteza Newcastle, US 205 1612
Thompson, Jeffrey G Auburn, US 33 346

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00