Vibrating-mass gyroscope systems and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11015934
APP PUB NO 20180031373A1
SERIAL NO

15717544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One embodiment of the invention includes a vibrating-mass gyroscope system. The system includes a sensor system comprising a vibrating-mass and a plurality of electrodes coupled to the vibrating-mass that are configured to facilitate in-plane motion of the vibrating-mass. The system also includes a gyroscope controller configured to generate a drive signal that is provided to a first set of the plurality of electrodes to provide an in-plane periodic oscillatory motion of the vibrating-mass along a drive axis, to generate a force-rebalance signal that is provided to a second set of the plurality of electrodes to calculate a rotation of the vibrating-mass gyroscope system about an input axis, and to generate a quadrature signal that is provided to a third set of the plurality of electrodes to substantially mitigate quadrature effects associated with the vibrating-mass.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHROP GRUMMAN SYSTEMS CORPORATION2980 FAIRVIEW PARK DRIVE FALLS CHURCH VA 22042-4511 UNITED STATES OF AMERICA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rozelle, David M Woodland Hills, US 12 163
Trusov, Alexander Studio City, US 13 219

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 25, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00