Underground GPS for use in plug tracking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10465499
APP PUB NO 20180030828A1
SERIAL NO

15548689

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for tracking an object in oil and gas wellbore operations wherein a releasable object carrying a first signal system is released into tube system associated with a wellbore. The first signal system communicates with one or more second signal systems positioned along the travel path of the object; along the surface of the formation; and/or throughout the wellbore. First signal system and the second signal system may communicate by RF signals. First signal system and any second signal systems positioned on the surface communicate by through-the-earth or very low frequency signals. A global positioning system may be utilized in conjunction with any second signal systems on the surface to identify the absolute location of the object in the underground wellbore. The first signal system carried by the object may be a piezoelectric system disposed to transmit a signal when the object experiences a predetermined pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Budler, Nicholas Frederick Claremore, US 17 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00