Hollow element manufacturing method and rotary machine manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10837071
APP PUB NO 20180030561A1
SERIAL NO

15551411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a hollow element which has an internal space and of which the internal space is cryogenically used, the method comprising a base material forming step of forming a base material which has a space to serve as the internal space; a filling step of filling the internal space of the formed base material with fluid having a temperature equal to or lower than a temperature at which the base material is subjected to solid-phase transformation and causing the base material to be subjected to the solid-phase transformation; and a finishing step of finishing the base material after the base material is subjected to phase transformation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES COMPRESSOR CORPORATION34-6 SHIBA 5-CHOME MINATO-KU TOKYO 108-0014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishibashi, Yusuke Tokyo, JP 8 4
Iwasaki, Shugo Tokyo, JP 3 15
Kawahara, Kosei Hiroshima, JP 8 8
Masuda, Yuji Hiroshima, JP 73 434
Tokuyama, Shinichiro Hiroshima, JP 28 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00