Overcoming the retardation of cement hydration from dispersing agents used in suspension of additives

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10202536
APP PUB NO 20180030330A1
SERIAL NO

15552159

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of cementing a subterranean formation includes forming a cement composition comprising cementitious material, an aqueous base fluid, a nano-reinforcement particle suspension comprising a surfactant; nano-reinforcement particle such as single-wall carbon nanotubes or multi-wall carbon nanotubes; and pozzolanic material; introducing the cement composition into a subterranean formation; and allowing the cement composition to set in the subterranean formation. A method of making a cement composition includes combining cementitious material, an aqueous base fluid, a nano-reinforcement particle suspension comprising a surfactant, nano-reinforcement articles such as single-wall carbon nanotubes or multi-wall carbon nanotubes, and a pozzolanic material, where the rate of hydration of the surfaces of the cementitious material is less retarded by the surfactant than an equivalent cement composition without pozzolanic material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dias, Toledo Filho Romildo Houston, US 2 1
Mendoza, Reales Oscar Houston, US 2 1
Pearl,, Jr William Cecil Houston, US 47 44
Ravi, Krishna Kingwood, US 20 415

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00