Two-part structural adhesive

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10280345
APP PUB NO 20180030319A1
SERIAL NO

15550965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A two-part adhesive is provided comprising: A) a curative part comprising: i) one or more epoxy curatives, where the one or more epoxy curatives include norbornane diamine (NBDA); and ii) a reaction intermediate which is the reaction product of a liquid epoxy resin having an epoxy functionality of 2 with an excess of the epoxy curatives; and B) an epoxy part comprising: iii) one or more multifunctional epoxy resins having an epoxy functionality of greater than 2.2; in some embodiments epoxy functionality of greater than 2.6; in some embodiments epoxy functionality of 3 or greater; and in some embodiments epoxy functionality of 4 or greater. In some embodiments the one or more epoxy curatives additionally include 4,7,10 Trioxa-1,13-tridecane-diamine (TDD). In some embodiments the one or more multifunctional epoxy resins include tetraglycidyl methylenedianiline (TGMDA).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANIESPO BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Lianzhou Woodbury, US 34 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00