Film layers and methods for forming the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10294340
APP PUB NO 20180030225A1
SERIAL NO

15646419

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A film layer and a method of forming a film layer are provided herein. The film layer includes a first polymer and a second polymer. The first polymer includes the reaction product of chlorotrifluoroethene and vinylidene fluoride utilized in the first polymer in an amount of at least 4 wt. %. The second polymer includes the reaction product of chlorotrifluoroethene and optionally, vinylidene fluoride utilized in the second polymer in an amount of less than 4 wt. %. A multilayer film and a method of forming a multilayer film are also provided herein. In an embodiment, a multilayer film includes a first film layer and a second film layer adjacent and sealed to the first film layer. At least one of the first film layer or the second film layer includes the first polymer and the second polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONEYWELL INTERNATIONAL INCINTELLECTUAL PROPERTY SERVICES GROUP 855 S MINT STREET CHARLOTTE NC 28202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Altman, Carl Pitman, US 3 99
Huang, Hanjin Shanghai, CN 2 4
Iwazu, Takahiro Tokyo, JP 1 1
Kerkar, Awdhoot Vasant Rockaway, US 20 543
Lee, Jong Soo Cressona, US 85 376
Xia, Tian Shanghai, CN 124 1005

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00