Method for the epoxidation of an olefin with hydrogen peroxide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10196370
APP PUB NO 20180030012A1
SERIAL NO

15550872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the method for the epoxidation of an olefin, the olefin is continuously reacted with hydrogen peroxide in a mixed reactor in the presence of a water soluble epoxidation catalyst, comprising a manganese complex, the reaction is carried out in a reaction mixture comprising an aqueous liquid phase and an organic liquid phase with mixing of the liquid phases, reaction mixture is continuously withdrawn from the mixed reactor and separated into a separated aqueous phase and a separated organic phase, and part of the separated aqueous phase is continuously recycled into the mixed reactor, with the combined hold-up time of aqueous phase in withdrawing, separating phases and recycling aqueous phase being kept at less than 15 minutes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EVONIK OPERATIONS GMBHRELLINGHAUSER STRASSE 1-11 ESSEN 45128

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
André, Joao BA Maastricht, NL 1 8
Imm, Sebastian Bad Vilbel, DE 8 90
Pascaly, Matthias Frankfurt, DE 31 377
Stock, Jürgen Frankfurt, DE 4 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00