Lifting mechanism using negative stiffness

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10081403
APP PUB NO 20180029657A1
SERIAL NO

15225081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lifting mechanism includes a load bearing structure, and a carrier. The carrier is configured for supporting a load. The carrier is moveable relative to the load bearing structure in a substantially vertical direction relative to a ground surface, along a vertical axis. A load carrying spring applies a spring force that biases the carrier relative to the load bearing structure in a direction along the vertical axis. A negative stiffness device interconnects the carrier and the load bearing structure. The negative stiffness device applies a device force that biases the carrier relative to the load bearing structure in a direction along the vertical axis. The device force opposes the spring force. The device force includes a magnitude that is substantially equal to the spring force in any of a plurality of different positions of the carrier relative to the load bearing structure along the vertical axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jodorkovsky, Mario Nesher, IL 13 163
Suissa, Avshalom Kiryat Ono, IL 40 603

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00