On-board vehicle electrical system having a converter and high-load consumer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10449917
APP PUB NO 20180029546A1
SERIAL NO

15664391

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An on-board electrical system for motor vehicles has a battery, a generator and at least one normal consumer that is connected to the battery in a switchable manner. A DC voltage/DC voltage converter is connected on its primary side to the battery and on its secondary side to a high-load resistor. A switch connects the high-load consumer to a storage device in a first switching position, and to the primary side in a second switching position. A controller controls and operates the switch between the first and the second switching position. A device that detects the actual electrical power of the high-load consumer is associated with the high-load consumer, and is connected at the output end to the controller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN RD FL4 DEARBORN MI 48126-2701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bojahr, Manuel Aachen NRW, DE 4 11
Eifert, Mark Hessen, DE 32 208
Mohrmann, Bjoern Aachen NRW, DE 3 9
Schmitz, Peter Aachen NRW, DE 24 228
Spijker, Engbert Nuth, NL 15 133
Warm, Armin Aachen NRW, DE 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00