Wire harness arrangement structure of vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10279755
APP PUB NO 20180029542A1
SERIAL NO

15656553

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a wire harness arrangement structure of a vehicle, comprising plural component control parts to control plural electric components for governing a drive of the vehicle, a main control part to generate a command signal for providing a command to the plural component control parts, and plural main wire harnesses to transmit the command signal. The plural electric components include at least a brake, an engine, a transmission, and a steering, and the plural main wire harnesses constitute a signal transmission loop which extends from the main control part and returns to the main control part by way of the plural component control parts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATIONJAPAN'S HIROSHIMA COUNTY GOVERNMENT IN THE NEW TOWN YUNJUN ANN 3 NO 1

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Michihira, Osamu Hiroshima, JP 32 779
Shimizu, Masaaki Iwakuni, JP 121 1979
Tamagawa, Taro Kure, JP 3 15
Yamada, Sadahisa Hiroshima, JP 17 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00