Controlling an intensity profile of an energy beam with a deformable mirror in additive manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10307822
APP PUB NO 20180029126A1
SERIAL NO

15655229

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additive manufacturing apparatus includes a platform, a dispenser to dispense layers of feed material on the platform, and a fusing system to direct an energy beam to fuse at least a portion of the outermost layer of feed material. The fusing system includes an energy source to emit the energy beam, a deformable mirror to receive the energy beam and reflect the energy beam, wherein a shape of the deformable mirror defines at least in part an intensity profile of the energy beam on the outermost layer of feed material, an actuator coupled to the deformable mirror, and a controller coupled to the actuator and configured to cause the actuator to deform the shape of the deformable mirror to adjust the intensity profile of the energy beam on the outermost layer of feed material in accordance to a desired profile.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED MATERIALS INC3050 BOWERS AVENUE SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Naftali, Ron Shoham, IL 52 497
Ng, Hou T Campbell, US 242 6041
Talbot, Christopher G Emerald Hills, US 18 985

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00