Power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10383262
APP PUB NO 20180027704A1
SERIAL NO

15549821

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The power conversion device of the invention includes: a cooling unit that is a prism, the interior of which is hollow, and that has a refrigerant inlet portion and a refrigerant outlet portion the cooling unit having in the interior thereof a refrigerant channel through which a refrigerant flows from the refrigerant inlet portion towards the refrigerant outlet portion; electronic devices that are respectively disposed on three or more surfaces on the outside of side surfaces of the cooling unit, excluding a refrigerant inlet surface, in which the refrigerant inlet portion is disposed, and a refrigerant outlet surface, in which the refrigerant outlet portion is disposed, the electronic devices being cooled by boiling of the refrigerant; and a hollow outer case 4 that covers the electronic devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asai, Yugo Chiyoda-ku, JP 26 58
Higashino, Hiroyuki Chiyoda-ku, JP 38 146
Ipposhi, Shigetoshi Chiyoda-ku, JP 26 119
Matsuo, Haruyuki Chiyoda-ku, JP 13 110
Shinozaki, Masaru Chiyoda-ku, JP 17 50
Yano, Hiroyuki Chiyoda-ku, JP 197 3220

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00