Optical data switching circuitry
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jan 8, 2019
Grant Date -
Jan 25, 2018
app pub date -
Jul 21, 2016
filing date -
Jul 21, 2016
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Embodiments of a computing device and optical data switching circuitry are generally described herein. A processing element of the optical data switching circuitry may generate a plurality of optical data signals, and may send the optical data signals to an optical switch of the optical data switching circuitry. The optical switch may transmit the optical signals to a fiber optic router for relay to different destinations. The optical switch may switch between transmission directions for transmission of the optical signals to different receiving ports of the fiber optic router. The receiving ports of the fiber optic router may be mapped to the different destinations, in some cases.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
RAYTHEON COMPANY | 870 WINTER STREET WALTHAM MA 02451-1449 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Keller, Sean D | Tucson, US | 66 | 453 |
# of filed Patents : 66 Total Citations : 453 | |||
Uyeno, Gerald P | Tucson, US | 74 | 448 |
# of filed Patents : 74 Total Citations : 448 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H04Q Class
- 0 % this patent is cited more than
- 6 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 8, 2026 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 8, 2030 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
