Methods and apparatus for SDI support for automatic and transparent migration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11128555
APP PUB NO 20180027093A1
SERIAL NO

15655874

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques for migration for composite nodes in software-defined infrastructures (SDI) are described. A SDI system may include a SDI manager component, including one or more processor circuits, configured to access one or more remote resources, the SDI manager component may include a partition manager configured to receive a request to create a composite node from an orchestrator component, the request including at least one preferred compute sled type and at least one alternative compute sled type. The SDI manager may create a composite node using a first compute sled matching the at least one alternative compute sled type. The SDI manager may determine, based upon a migration table stored on a non-transitory computer-readable storage medium that a second compute sled matching the at least one preferred compute sled type is available. The SDI manager may perform an migration from the first compute sled to the second compute sled. Other embodiments are described and claimed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balle, Susanne M Hudson, US 98 625
Guim, Bernat Francesc Barcelona, ES 474 2775
Leung, John Chun Kwok Folsom, US 8 113
Myers, Mark S Portland, US 15 263
Nachimuthu, Murugasamy K Beaverton, US 120 1269
Prabhakaran, Suraj Aachen, DE 74 484
Putyrski, Slawomir Gdynia, PL 41 355
Rivas, Barragan Daniel Cologne, DE 32 169

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00