Method and apparatus for controlling congestion in communication system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10492097
APP PUB NO 20180026898A1
SERIAL NO

15547470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a 5G or a pre-5G communication system for supporting a higher data transmission rate than a 4G communication system such as LTE. A method for controlling TCP congestion in a communication system provided in the present disclosure comprises the steps of: determining the maximum transmission rate of a network, while increasing the size of a congestion window at a predetermined time interval; determining a threshold transmission rate which is determined by a preset ratio with regard to the determined maximum transmission rate; and adjusting the size of the congestion window such that the current transmission rate is not less than the threshold transmission rate and the delay time is no longer than the maximum allowable delay time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jin-Sung Seoul, KR 76 663
Lee, Joo-Hyung Bucheon-si, KR 237 6049
Lee, Kyunghan Ulsan, KR 30 88
Lim, Han-Na Seoul, KR 75 1518
Park, Jung-Shin Seoul, KR 123 1578

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00