Power source supply circuit, amplifier, communication device, base station, and power source supply method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10361693
APP PUB NO 20180026619A1
SERIAL NO

15548438

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power source supply circuit includes: a plurality of power sources (11-1, 11-2) that generate power source voltages different from each other; a switch circuit (14) that switches and outputs the power source voltages generated in the plurality of power sources (11-1, 11-2); a voltage output terminal (16) that outputs outside the power source voltages output from the switch circuit (14); an RF choke circuit (15) provided between the switch circuit (14) and the voltage output terminal (16), the RF choke circuit (15) including a first capacitor; and a second capacitor (12-1, 12-2) provided between the plurality of power sources (11-1, 11-2) and the switch circuit (14), the second capacitor (12-1, 12-2) having a larger capacitance than the first capacitor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEC CORPORATION7-1 SHIBA 5-CHOME MINATO-KU TOKYO 108-8001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Murao, Yoji Tokyo, JP 7 71
Shiikuma, Kazumi Tokyo, JP 22 299

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00