Power supply device and control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10148167
APP PUB NO 20180026524A1
SERIAL NO

15655986

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply device includes: a first transformer including a primary winding and a secondary winding; a first control circuit controlling a switching operation of a switch element, and cause the primary winding to generate a first AC voltage; an application circuit receiving a second AC voltage generated in the secondary winding by mutual induction with the primary winding, and apply an output voltage according to the second AC voltage to a load; a voltage detection circuit detecting a magnitude of a DC voltage obtained by rectifying the first AC voltage or the second AC voltage; and an output circuit outputting a stop signal indicating stop of the power supply device, when a result of comparison between the magnitude of the DC voltage and a threshold value set according to a magnitude of the load satisfies a predetermined condition, after reception of an instruction to stop voltage supply.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KONICA MINOLTA INCTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Mikiyuki Toyohashi, JP 25 96
Cho, Kouei Toyohashi, JP 15 45
Kasamatsu, Toru Toyokawa, JP 28 232

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00