Electroabsorption modulator integrated distributed feedback laser with integrated semiconductor optical amplifier, and driving method for same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10128632
APP PUB NO 20180026424A1
SERIAL NO

15547886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a driving method for an SOA integrated EA-DFB laser monolithically-integrating a DFB laser portion, an EA modulator portion and an SOA portion, on a same substrate, wherein an electric current ISOA is injected into the SOA portion within a range of a power consumption not exceeding a total amount of a power consumption eliminated in the DFB laser portion of the SOA integrated EA-DFB laser and a power consumption eliminated in the EA modulator portion of the SOA integrated EA-DFB laser by eliminating an elimination amount ΔIDFB from a maximum injection electric current into a DFB laser portion of an EA-DFB laser allowable in a case of mounting the EA-DFB laser on an optical transmission module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON TELEGRAPH AND TELEPHONE CORPORATION5-1 OTEMACHI 1-CHOME CHIYODA-KU TOKYO 1008116

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Toshio Atsugi, JP 117 1322
Kobayashi, Wataru Atsugi, JP 49 210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00