Condensate recovery for reversible solid oxide fuel cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10026982
APP PUB NO 20180026290A1
SERIAL NO

15213628

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments described herein provide for water reclamation from the exhaust stream of a RSOFC while the RSOFC operates in fuel cell mode. The reclaimed water is stored for use by the RSOFC while in electrolysis mode. An embodiment includes a RSOFC, a condensate tank, a condenser, and a controller. The RSOFC generates electrical power and water vapor by consuming hydrogen gas in the fuel cell mode, and consumes electrical power and water to generate the hydrogen gas in the electrolysis mode. The condenser condenses the water vapor into water, and directs the water to the condensate tank. The controller, responsive to transitioning the RSOFC from the fuel cell mode to the electrolysis mode, supplies the water to the RSOFC from the condensate tank, and supplies the electrical power to the RSOFC to electrolyze the water and to generate the hydrogen gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cannova, Catherine Newport Beach, US 1 2
Mermelstein, Joshua M Laguna Niguel, US 8 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00