Electrode assembly including coupling part between electrode tabs and electrode lead located in space portion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10615398
APP PUB NO 20180026254A1
SERIAL NO

15513692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are an electrode assembly including a plurality of unit cells arranged in a height direction on the basis of a plane, at least two of the unit cells having different planar sizes, and a space portion defined by the difference in planar size between the arranged unit cells, wherein each of the unit cells includes at least one electrode plate, electrode tabs protruding from the electrode plates of the unit cells are electrically connected to an electrode lead via a tab-lead coupling part, and the tab-lead coupling part is located in the space portion, and a battery cell including the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ENERGY SOLUTION LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Jung Hwa Daejeon, KR 38 678
Kim, Hyun Min Daejeon, KR 70 409
Lee, Ho Sub Daejeon, KR 15 158
Lim, Seong Yoon Daejeon, KR 10 28
Oh, Sei Woon Daejeon, KR 30 76
Shim, Jung Ah Daejeon, KR 6 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00