TFT circuit board and display device having the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11063154
APP PUB NO 20180026138A1
SERIAL NO

15649126

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention allows stable fabrication of a TFT circuit board used in a display device and having thereon an oxide semiconductor TFT. A TFT circuit board includes a TFT that includes an oxide semiconductor. The TFT has a gate insulating film formed on part of the oxide semiconductor and a gate electrode formed on the gate insulating film. A portion of the oxide semiconductor that is covered with the gate electrode 104 and a portion of the oxide semiconductor that is not covered with the gate electrode are both covered with a first interlayer insulating film. The first interlayer insulating film is covered with a first film 106, and the first film is covered with a first AlO film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JAPAN DISPLAY INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ariyoshi, Tomoyuki Tokyo, JP 14 95
Karikome, Osamu Tokyo, JP 7 13
Takaya, Ryohei Tokyo, JP 4 9
Watabe, Kazufumi Tokyo, JP 49 194
Yamaguchi, Yohei Tokyo, JP 95 212

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 13, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 13, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 13, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00