Silicon chalcogenate precursors, methods of forming the silicon chalcogenate precursors, and related methods of forming silicon nitride and semiconductor structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9929006
SERIAL NO

15215102

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A silicon chalcogenate precursor comprising the chemical formula of Si(XR1)nR24-n, where X is sulfur, selenium, or tellurium, R1 is hydrogen, an alkyl group, a substituted alkyl group, an alkoxide group, a substituted alkoxide group, an amide group, a substituted amide group, an amine group, a substituted amine group, or a halogen group, each R2 is independently hydrogen, an alkyl group, a substituted alkyl group, an alkoxide group, a substituted alkoxide group, an amide group, a substituted amide group, an amine group, a substituted amine group, or a halogen group, and n is 1, 2, 3, or 4. Methods of forming the silicon chalcogenate precursor, methods of forming silicon nitride, and methods of forming a semiconductor structure are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICRON TECHNOLOGY INC8000 SOUTH FEDERAL WAY BOISE ID 83716-9632

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pandey, Sumeet C Boise, US 43 570
Quick, Timothy A Boise, US 72 1974
Uhlenbrock, Stefan Boise, US 70 2459

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00