Switch device and method for manufacturing switch device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9959987
SERIAL NO

15651375

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switch device includes a housing having a case and a holding member, a moving member, a biasing member, a movable contact, a common fixed contact, a first switching fixed contact, a second switching fixed contact, extending portions, at least two terminal members, and resistors for obtaining the resistance value between two terminal members, and fixing portions to which the resistors are soldered. The holding member includes a bottom wall portion that covers the bottom of the case, and a holding wall portion holding the fixing portions. The holding wall portion is formed of a first synthetic resin material having heat resistance, and the bottom wall portion is made of a second synthetic resin material having a heat distortion temperature lower than that of the first synthetic resin material. A method for manufacturing a switch device includes a first molding step, a resistor mounting step, and a second molding step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALPS ALPINE CO LTD1-7 YUKIGAYA-OTSUKAMACHI OTA-KU TOKYO 145-8501

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tanaka, Takaki Miyagi-ken, JP 6 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00