Method of manufacturing metal nano coil

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10790086
APP PUB NO 20180025842A1
SERIAL NO

15548761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of manufacturing a metal nano coil which is suitable for mass production and results in a lower manufacturing cost. The method of manufacturing a metal nano coil includes the steps of: forming, with tension applied to a core member composed of nanofiber of a polymer, a metal thin film on a surface of the core member to fabricate a metal-covered nanofiber; reducing the tension of the metal-covered nanofiber; and heating, with the tension reduced, the metal-covered nanofiber to at or above a boiling point or a thermal decomposition temperature of the polymer and at or below the melting point of the metal thin film to vaporize the core member and shrink the metal thin film into a coil form, so that a hollow metal nano coil is produced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTDTOKYO
AKITA UNIVERSITY1-1 TEGATA GAKUEN-MACHI AKITA-SHI AKITA 010-8502
TSUCHIYA CO LTD9-29 KAMIMAEZU 2-CHOME NAKA-KU NAGOYA-SHI AICHI 4608330

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Hiroaki Aichi, JP 139 1014
Horizono, Hideki Tokyo, JP 14 24
Ishikawa, Naomoto Tokyo, JP 21 102
Kamihara, Nobuyuki Tokyo, JP 34 74
Muraoka, Mikio Akita, JP 10 3
Takayanagi, Toshiyuki Tokyo, JP 10 4
Tsuji, Kotaro Aichi, JP 4 4
Yoshida, Osamu Aichi, JP 242 2213

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00