Staged power on/off sequence at the I/O phy level in an interchip interface

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10901936
APP PUB NO 20180024963A1
SERIAL NO

15215636

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, system, and/or computer program product controls transitions from a first bandwidth to a second bandwidth in a bus within a multi-processor computer. A bus controller predicts a bandwidth transition requirement for a bus in a multi-processor computer, and transitions the bus from a first bandwidth to a second bandwidth based on the predicted bandwidth transition requirement. The bus controller checks an actual transitioning requirement of the bus in the computer, such that the bus controller checks the actual transitioning requirement for the bus at each occurrence of a predefined stage of operation of one or more processor processors in the computer. In response to the actual transitioning requirement matching the predicted bandwidth transition requirement, the bus controller directions a continuation of the transitioning of the bus from the first bandwidth to the second bandwidth.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dreps, Daniel M Georgetown, US 124 1377
Jayaraman, Prasanna Austin, US 56 293
Spear, Michael B Round Rock, US 20 474

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00