Adaptive tablewalk translation storage buffer predictor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10255197
APP PUB NO 20180024941A1
SERIAL NO

15215027

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for generating predictions for a hardware table walk to find a map of a given virtual address to a corresponding physical address is disclosed. The system includes a plurality memories, which each includes respective plurality of entries, each of which includes a prediction of a particular one of a plurality of buffers which includes a portion of a virtual to physical address translation map. A first circuit may generate a plurality of hash values to retrieve a plurality of predictions from the plurality of memories, where each has value depends on a respective address and information associated with a respective thread. A second circuit may select a particular prediction of the retrieved predictions to use based on a history of previous predictions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORACLE INTERNATIONAL CORPORATION500 ORACLE PARKWAY MAIL STOP 5OP7 REDWOOD SHORES CA 94065

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Levinsky, Gideon Cedar Park, US 9 61
Pape, John Cedar Park, US 10 43
Shah, Manish Austin, US 72 1047
Smolens, Jared Santa Clara, US 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00