Motor controller and industrial machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10261520
APP PUB NO 20180024572A1
SERIAL NO

15548191

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor controller includes: an error suppression compensation unit that outputs an error suppression signal for driving the motor such that a difference between the position command signal and a signal based on the motor position signal equals zero; an acceleration extraction unit that outputs an acceleration component of a natural frequency of a stand from a stand vibration signal; an acceleration compensation unit that outputs a proportional compensation signal obtained by multiplying the stand acceleration signal by a proportional gain; a machine end correction unit that outputs a machine end correction signal, and decreases an amplitude of vibration at the machine end relative position; and an addition unit that outputs a signal obtained by adding the machine end correction signal to the error suppression signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amigasaya, Shigeo Tokyo, JP 2 14
Ikeda, Hidetoshi Tokyo, JP 73 681
Kai, Takashi Tokyo, JP 37 427
Sekiguchi, Hiroyuki Tokyo, JP 71 1406

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00