Plant operation support system with management of assigned resources using predictions of resource deficiency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10324456
APP PUB NO 20180024543A1
SERIAL NO

15444452

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of this invention is to provide a plant operation support-system server and a plant operation support system which can manage the current situation of overall resources that are required for performing jobs corresponding to a procedure manual, and can further achieve resource management with enough margin based on future prediction. Using a current procedure-manual location determination unit, a control unit of a plant operation support-system server determines a current location in procedure-manual data DM, based on a condition of the plant acquired through sensors by a plant data acquisition unit. When there is a change in the current location, the control unit causes a current-situation management determination unit to assign currently-required resources according to the current position and causes a predictive management determination unit to predict presence/absence of resource deficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukami, Kenta Tokyo, JP 8 14
Kitamura, Shingo Tokyo, JP 36 145

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00