Active eye-to-eye with alignment by X-Y capacitance measurement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10114297
APP PUB NO 20180024436A1
SERIAL NO

15629183

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present disclosure generally relate to systems and methods for performing photolithography processes. In one embodiment, a photolithography system includes a plurality of image projection systems each having an extendable lens, and a plate having a plurality of openings. Each extendable lens is configured to be extended through a corresponding opening of the plurality of openings during operation. The plate includes one or more elements disposed adjacent each opening and each lens includes one or more elements formed thereon. The one or more elements formed on the plate and the one or more elements formed on the lens are utilized to measure one or more distances between the lens and the plate. Any deviation of the measured distance from a reference distance indicates that the lens has been shifted. Measures to compensate for the shifting of the lens will be performed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED MATERIALS INC3050 BOWERS AVENUE SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaskey, Jeffrey Livermore, US 9 45
Laidig, Thomas L Richmond, US 49 402

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00