Hybrid fiber power connection system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10401574
APP PUB NO 20180024302A1
SERIAL NO

15546585

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector body includes a connector body (111) having a main body (10) and two sub bodies (12) that project from a first side of the main body (10). A latching mechanism (14) at the first side of the main body is positioned between the sub bodies. Electrical conductors (18a, 18b) are positioned in the sub bodies and have interface ends at a forward face of the main body. First and second ferrules (16a, 16b) are mounted at the main body. The first and second ferrule are spring biased in a forward direction perpendicular to the forward face of the main body. The first and second ferrules have interface ends accessible at the forward face. Optical fibers (19a, 19b) are supported by the first and second ferrules (16a, 16b).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMSCOPE TECHNOLOGIES LLC3642 E US HIGHWAY 70 CLAREMONT NC 28610

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bretz, Dwight A Hummelstown, US 22 236
Chappell, Eric Ryan Statesville, US 10 68
Flaig, Robert Charles Lancaster, US 58 581
Gurreri, Michael Lawrence York, US 52 771

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00