Universal power distribution test tool and methodology

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10126374
APP PUB NO 20180024204A1
SERIAL NO

15215280

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methodologies and systems are described herein whereby the electrical performance of a device may be tested. In one or more embodiments, a system for testing the electrical performance comprises a monitoring device configured to perform a set of operations including concurrently monitoring at least three different test points of a device under test (DUT) and aggregating test data comprising signal information collected concurrently from at least three different test points of the DUT. In one or more embodiments, the system is configured to monitor at least three channels wherein at least one channel corresponds to a frequency range of less than 300 kHz and the phases of signals on at least three channels are different.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORACLE INTERNATIONAL CORPORATION500 ORACLE PARKWAY MAIL STOP 5OP7 REDWOOD SHORES CA 94065

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Novak, Istvan Bedford, US 30 424

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00