Control device for vehicle and control method for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10221943
APP PUB NO 20180023697A1
SERIAL NO

15648558

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When a power-on downshift via an intermediate shift stage accompanied by input switching control is required and a predetermined shift stage is a shift stage lower than the intermediate shift stage, an electronic control unit performs torque phase control in a torque phase control time shorter than the torque phase control time that is set when the predetermined shift stage is a shift stage higher than the intermediate shift stage. Accordingly, it is possible to complete disengagement of a disengagement-side element early and to suppress a rapid increase of an input shaft rotation speed due to a clutch torque remaining.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwami, Tomoya Chita-gun, JP 5 15
Ota, Keisuke Toyota, JP 91 695
Sagawa, Ayumu Toyota, JP 31 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00